Skip to main content

Solution

EV Charging for Hotels & Resorts

Guest Amenity. Metered Per Session. OCPP-Ready.

EV chargers for hotels across India — from budget highway hotels to 5-star resorts. Type 2 AC chargers (3.3 kW to 22 kW), OCPP 1.6J / 2.0.1 to connect to your charging management system, and per-session metering. Designed and manufactured at our Delhi NCR facility.

Why hotels are installing EV charging now

Four reasons the EV charger is becoming as standard as the in-room WiFi router.

Guest Amenity, Not Cost Centre

Guests increasingly expect on-site EV charging. Installing a charger at your hotel is equivalent to offering WiFi ten years ago — guests filter by it on OTAs and book accordingly.

Per-Guest Billing

Every charger meters each session and reports it over OCPP 1.6J / 2.0.1 to the charging management system (CMS) you choose. Your team can then post sessions to the guest folio from the CMS records.

Demand Visibility

Hotel peak demand is already high (HVAC + kitchen + laundry). A Titan energy meter on the charger feeder shows exactly what the chargers add to your maximum demand, so you can size the connection and set charging hours with real data.

Rooftop Solar Pairing

If your hotel already has rooftop solar, encourage daytime charging to use more of your own generation. Titan meters on the solar and charger feeders show how much of the charging energy came from the roof.

Sizing guide by hotel type

A right-sized deployment depends on guest mix, parking count, and grid connection. Typical starting points below.

Budget Hotels (up to 40 rooms)

1–2 × 3.3 kW Single Socket chargers. Good for overnight guest charging. Simple wall-mount install.

Mid-market Hotels (40–150 rooms)

2–4 × 7.4 kW or 11 kW Type 2 chargers in the guest parking area, sized for overnight and half-day stays.

Luxury / Resort Hotels (150+ rooms)

4–8 × 11 kW or 22 kW Type 2 chargers, with the supply sized for all of them running together. A valet-operated charger at the porte-cochère suits guests arriving with a low battery.

Highway Resorts & Dhabas

2–4 × 22 kW Type 2 AC chargers for meal-stop and overnight top-ups. Our range is AC only; for short highway stops that need DC fast charging, pair our AC chargers with a specialist DC supplier. Check PM E-DRIVE and state charging incentives for the site.

What we supply, and what your contractor does

Tech OVN supplies the chargers and metering, a bill of quantities, commissioning support and help with OCPP integration to your charging management system. For bulk orders we can adapt charger firmware to suit your platform. Site surveys, DB modification and civil work (bay marking, bollards, signage) are done by your electrical contractor.

Because we manufacture the charger hardware in-house, you deal with one vendor for the charger, its OCPP firmware and the energy-metering layer that records every charging session.

Learn about EV charger metering and billing →

Frequently asked questions

Six questions hotel owners and facility managers ask before deciding.

For most hotels, 7.4 kW to 22 kW Type 2 AC chargers strike the right balance — guests charge overnight or during a stay, and you avoid the capex of DC fast chargers. Most guests' cars accept 7.2–11 kW AC, so a 22 kW unit charges each car only as fast as its onboard charger allows. Tech OVN makes AC chargers only.
Start by making a share of your parking EV-capable (cabling and DB capacity in place), then install working chargers on some of those bays and add more as guest demand grows. Check your state's building rules too — Maharashtra's 2025 policy, for example, requires new commercial buildings to make at least 50% of parking EV-ready. Our EV charger sizing calculator works out a starting count from your parking and guest mix.
Two approaches: (a) bundle charging into the room tariff as a complimentary amenity, or (b) meter each session and charge the guest for it. Option (b) needs a charger that reports sessions over OCPP 1.6J / 2.0.1 to a charging management system — all Tech OVN chargers support both versions. We help with the OCPP integration to your chosen CMS, and for bulk orders we can adapt firmware to suit it; linking the CMS to your PMS is done on the CMS or PMS side.
Yes. Tech OVN Type 2 chargers can keep charging if connectivity drops — guests can still start sessions with an RFID card — and session records are sent to the CMS when connectivity returns.
Few states pay anything for a hotel's private AC chargers. Delhi's 2026 EV policy has no per-charger grant (the old ₹6,000 grant belonged to the 2020 policy). Maharashtra's 2025 policy supports DC fast chargers of 50 kW and above, and Karnataka's 25% capital subsidy is for fast-charging stations. Haryana offers 20% of capital cost (up to ₹50,000) on public stations in commercial buildings outside FAME cities, Tamil Nadu offers 25% capital subsidy (up to ₹10 lakh) on its first 50 private stations, and PM E-DRIVE funds public charging but not private workplace chargers. Check the current figures in our EV policy guide (/guides/ev-policy-india) before counting on a subsidy.
Catalogue chargers ship from stock for regular orders; orders of 200 units or more take about 4 weeks. Your electrical contractor handles the site work — DB modification, cabling, bay marking — and we support commissioning and the OCPP integration with your chosen charging management system.

Beyond EV: the full hotel stack

EV charging is usually the headline project, but the same meter family covers three other hotel pain points. Titan Plus BTU on the chilled-water loop lets you track HVAC efficiency (COP) continuously — HVAC is usually one of the largest electrical loads in a hotel. Titan on the kitchen, laundry, and tower sub-feeds lets you see which wing is drifting and which floor is leaving corridor lights on. Titan Compliance on the fire-pump feeder logs the weekly and monthly pump test runs, so the test record for the next fire inspection is a report instead of a logbook hunt.

Hotel groups often start with EV charging because guests see it, then add sub-metering and fire-pump test logging in a second phase — same vendor, same dashboard.

Ready for a BOQ?

Tell us your property size, parking layout, and target guest mix. We come back within 48 hours with a full bill of quantities.