Industry
Smart Meters for DISCOMs & Utilities
IS 16444. DLMS-COSEM. AMISP-Ready.
Smart meter, static meter, and AMI infrastructure for Indian DISCOMs, AMISPs, and state utilities. Manufactured in Haryana since 1947 (as OVN Engineers), now delivering next-generation AMI-ready hardware with RF mesh, 4G cellular, prepaid billing, and theft-detection built in.
Why DISCOMs work with us
Four reasons our meters land on DISCOM approval lists across northern and western India.
IS 16444 & IS 13779 Certified
Smart meters to IS 16444 (3-phase & single-phase, RF/4G) and static meters to IS 13779. Meets CEA accuracy, DLMS-COSEM, and NTP/time-sync requirements out of the box.
AMISP-Ready Infrastructure
Built for AMISP (Advanced Metering Infrastructure Service Provider) deployments. HES-friendly — works with every major HES vendor operating in India.
RF Mesh + 4G Options
RF mesh for dense urban rollout, 4G cellular for rural feeders. Same meter body, different comms module — simplifies DISCOM inventory and training.
Tamper & Theft Detection
On-meter detection for magnetic tampering, ESD, CT bypass, neutral missing, and cover-open events. Real-time alerts to the HES for AT&C-loss reduction programmes.
Utility metering portfolio
Our utility-side SKUs, organised by what a DISCOM typically procures.
Single-Phase Smart Meter
IS 16444-compliant. Prepaid / postpaid modes, RF or 4G comms, ToU tariffs, net-metering variant for rooftop solar consumers.
Three-Phase Smart Meter
For commercial, industrial, and large residential loads. Harmonic analysis, power-factor logging, kVA demand — all reportable via DLMS-COSEM.
Static Meter (IS 13779)
For sub-divisional and feeder-level installation where smart functionality is not yet required. Class 1 active, Class 2 reactive, pulse output for AMR.
AMI System & HES Integration
End-to-end AMI stack — meters, DCU, RF mesh, data concentrator units, and HES integration. Support for revenue management, outage detection, and prepaid billing.
RDSS & AMI rollout support
The Revamped Distribution Sector Scheme (RDSS) is driving the largest smart-meter rollout India has seen — 250M+ meters planned by 2026. Our team supports AMISP bidders and DISCOMs through the full procurement cycle: meter specification response, CPRI/ERDA test-report collation, BOM costing, sample supply for tender technical rounds, and deployment planning.
On the HES side, our meters work with every major HES platform active in India — Itron, Fluentgrid, Secure, Landis+Gyr-style integrations. Protocol stack is standard DLMS-COSEM with OBIS code support, so integration work is typically 4–6 weeks including FAT and SAT.
Frequently asked questions
Six questions DISCOM procurement officers and AMISP project managers ask before a sample order.
Related products
The utility-side SKUs — all manufactured at our Haryana facility.
Supporting a DISCOM tender?
Talk to our utility team about spec response, CPRI reports, sample supply, and deployment planning.